<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Durock sewer main replacement bid awarded</title>
	<atom:link href="http://www.mtdemocrat.com/news/eid-oks-construction-of-mother-lode-forcemain-phase/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.mtdemocrat.com/news/eid-oks-construction-of-mother-lode-forcemain-phase/</link>
	<description>California&#039;s Oldest Newspaper - Est. 1851</description>
	<lastBuildDate>Wed, 22 May 2013 07:46:04 -0700</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.5.1</generator>
	<item>
		<title>By: Foaming at the Mouth</title>
		<link>http://www.mtdemocrat.com/news/eid-oks-construction-of-mother-lode-forcemain-phase/comment-page-1/#comment-281798</link>
		<dc:creator>Foaming at the Mouth</dc:creator>
		<pubDate>Wed, 17 Oct 2012 23:43:13 +0000</pubDate>
		<guid isPermaLink="false">http://www.mtdemocrat.com/?p=245324#comment-281798</guid>
		<description><![CDATA[If only everyone was as well-informed as you and I are!]]></description>
		<content:encoded><![CDATA[<p>If only everyone was as well-informed as you and I are!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Eldorado</title>
		<link>http://www.mtdemocrat.com/news/eid-oks-construction-of-mother-lode-forcemain-phase/comment-page-1/#comment-281335</link>
		<dc:creator>Eldorado</dc:creator>
		<pubDate>Wed, 17 Oct 2012 16:29:29 +0000</pubDate>
		<guid isPermaLink="false">http://www.mtdemocrat.com/?p=245324#comment-281335</guid>
		<description><![CDATA[12 inch pipe? Huh? The EIR they did for that project limited it to a 6 inch pipe. And, they only got the 6 inch because the proposed 4 inch created too much friction.
Nothing new at EID...same story, different time.]]></description>
		<content:encoded><![CDATA[<p>12 inch pipe? Huh? The EIR they did for that project limited it to a 6 inch pipe. And, they only got the 6 inch because the proposed 4 inch created too much friction.<br />
Nothing new at EID&#8230;same story, different time.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
<!-- This Quick Cache file was built for (  www.mtdemocrat.com/news/eid-oks-construction-of-mother-lode-forcemain-phase/feed/ ) in 0.21556 seconds, on May 22nd, 2013 at 2:02 am PDT. -->
<!-- This Quick Cache file will automatically expire ( and be re-built automatically ) on May 22nd, 2013 at 3:02 am PDT -->